Herringbone floor from bare concrete to finished

Floor installation · 2026

A whole flat, taken room by room across nine days. The photos follow the job from the adhesive being combed onto the concrete to the last coat of lacquer drying.

The same herringbone floor straight after sanding and after lacquering, the same day

Before and after

Drag the handle to compare. You can also use the arrow keys.

We check the subfloor, measure moisture and level it where needed. The parquet sits in the room for a few days before we start, so it has taken up the moisture in the air and will not move after laying.

Then the pieces are glued down, one at a time, from a centre line in each room. It takes longer at the start, and it is the reason the pattern sits square to the walls you actually look at when you come in.

The before and after slider here was taken the same day, five hours apart: on the left the floor is freshly sanded and dry, on the right it has been lacquered. That is the difference people rarely get to see, because they come back to a finished floor.

Service
Floor installation
Year
2026

More photos

Got a floor that looks like this? Call, or send a few photos, and we will tell you what is possible.